TW FENCING PH: (08) 8983 1264            

Icthys Onshore LNG Facilities

We manufactured, supplied and installed:

  • 9700 lineal metres of TR20 handrail on the reservoir wall

  • 20000 lineal metres of 2400mm high chainmesh fence with three rows of barbed wire on the perimeter

We installed the handrail at an average of 300m per day in harsh conditions, including working at heights, to beat the wet season. This stage of the project was completed in record time with the safest measures and to the highest quality.

The INPEX Icthys LNG Project includes several of the world’s largest and most advanced offshore facilities that are linked to massive onshore facilities in Darwin via an 889km pipeline.

ClientEast Arm Civil
LocationIcthys Onshore LNG Facilities, NT
DurationHandrail laid at an average 300m/day
ProductsHandrail, chainmesh