We manufactured, supplied and installed:
9700 lineal metres of TR20 handrail on the reservoir wall
20000 lineal metres of 2400mm high chainmesh fence with three rows of barbed wire on the perimeter
We installed the handrail at an average of 300m per day in harsh conditions, including working at heights, to beat the wet season. This stage of the project was completed in record time with the safest measures and to the highest quality.
The INPEX Icthys LNG Project includes several of the world’s largest and most advanced offshore facilities that are linked to massive onshore facilities in Darwin via an 889km pipeline.