Territory Wire manufactured, supplied and installed 9700LM of TR20 handrails on the reservoir wall of the Icthys Onshore LNG facilities and 20000LM of 2400mm high chainmesh fence with three rows of barbed wire on the perimeter
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed